Back to Portfolio
Wrought Iron Railings
Commercial
New Jersey, NJ
September 2026

Sidewalk Guardrail at a Stucco Building

Project Overview

Black vertical-bar guardrail installed along the raised sidewalk and entry walk at a stucco commercial building, returning down the curb-side steps.

Analysis

The walkway sits above street level with a drop along the parking edge. A continuous guard with a return at the steps gives pedestrians one protected path.

Process

Site survey, shop fabrication, coating, installation in one mobilization, and final alignment.

Outcome

A protected pedestrian path from the street to the building entry that meets guard height requirements.

Project Details

Materials Used

Steel posts, top rail and vertical bar infill, satin black coating, welded base plates, and anchors into the concrete walk.

Methods & Techniques

Layout along the full walk, posts anchored at consistent spacing, a return section fabricated to follow the steps down to grade.

Key Highlights

Continuous run, stair return section, curb-side protection, satin black finish

Call Now